The Offshore oil 981 deepwater semi-submersible drilling platform, referred to as "Offshore oil 981", started construction on April 28, 2008. It is the first self-designed and built sixth-generation deepwater semi-submersible drilling platform in China. It is fully invested and built by China National Offshore Oil Corporation, integrating the world's first-class design concept and first-class equipment. It is the first in the world to be designed in accordance with the harsh sea conditions of the South China Sea, and can withstand a once-in-200-year typhoon. The whole project is completed in accordance with the needs and design concepts of China National Offshore Oil Corporation, and CNOOC owns the independent intellectual property rights of the ship type. The completion of the platform indicates that China has developed independent research and development capabilities and international competitiveness in the field of ocean engineering equipment.
The world's first cylindrical offshore oil drilling platform, the platform is suitable for a variety of Marine environments, can be used for 10,000 feet deep sea operations, with 150,000 barrels of crude oil storage capacity, is the world's offshore oil drilling platform in the highest level of technology, the most powerful leading product.
The world's first cylindrical offshore oil drilling platform, the platform is suitable for a variety of Marine environments, can be used for 10,000 feet deep sea operations, with 150,000 barrels of crude oil storage capacity, is the world's offshore oil drilling platform in the highest level of technology, the most powerful leading product.
China's most advanced jack-up drilling platform "Offshore oil 944", the platform represents the highest level of China's jack-up drilling platform, which adopts the design of large pile boots in the world is the first time, filling the platform vacancy in the soft layer soil area of China's sea. "Offshore Oil Platform 944" has a total tonnage of 1403 tons, a net tonnage of 4209 tons, a total length of 165.135 meters, a total length of 98.07 meters (including helicopter deck), a total width of 68 meters, a length of 70 meters, a depth of 9.8 meters, a helicopter deck diameter of 22.2 meters, a towing draft of 6.5 meters, and a living area that can accommodate a total of 150 people.
China's most advanced jack-up drilling platform "Offshore oil 944", the platform represents the highest level of China's jack-up drilling platform, which adopts the design of large pile boots in the world is the first time, filling the platform vacancy in the soft layer soil area of China's sea. "Offshore Oil Platform 944" has a total tonnage of 1403 tons, a net tonnage of 4209 tons, a total length of 165.135 meters, a total length of 98.07 meters (including helicopter deck), a total width of 68 meters, a length of 70 meters, a depth of 9.8 meters, a helicopter deck diameter of 22.2 meters, a towing draft of 6.5 meters, and a living area that can accommodate a total of 150 people.
"Deep Sea No. 1" is the world's first 100,000-ton deep water semi-submersible production and storage platform independently developed and built by China. This latest major equipment for Marine engineering has realized 3 world-class innovations and used 13 domestic pioneering technologies, and is known as a masterpiece of technology in relevant fields in China so far.
"Deep Sea No. 1" is the world's first 100,000-ton deep water semi-submersible production and storage platform independently developed and built by China. This latest major equipment for Marine engineering has realized 3 world-class innovations and used 13 domestic pioneering technologies, and is known as a masterpiece of technology in relevant fields in China so far.
Copyright©2024 All Rights Reserved
Shanghai Ruizhan Model Co., Ltd.